A kitchen remodel is one of the most impactful home improvements Maryland homeowners can make. It’s also one of the most disruptive, which is why understanding the timeline is critical before starting. In 2026, kitchen remodel timelines depend on scope, planning, and material availability.
Below is a realistic breakdown of how long a typical Maryland kitchen renovation takes from start to finish.
1. Planning and Design Phase
The planning phase usually takes four to eight weeks. This includes layout design, material selections, budgeting, and finalizing construction drawings.
2. Permits and Approvals
Permits can take two to six weeks depending on the county. Baltimore County and surrounding jurisdictions require plan reviews before construction begins.
3. Ordering Materials
Cabinetry, appliances, countertops, and specialty materials are ordered during the planning phase. Lead times vary and can impact the start date if delays occur.
4. Pre-Construction Preparation
Before demolition, contractors protect surrounding areas, set up temporary kitchen solutions, and schedule inspections. This phase typically lasts one week.
5. Demolition
Demolition usually takes one to two weeks. This includes removing cabinets, countertops, flooring, and appliances while preparing the space for rebuilding.
6. Structural and Mechanical Work
If walls are moved or systems are updated, framing, plumbing, electrical, and HVAC work can take two to four weeks.
7. Inspections
Required inspections occur throughout the project. These checkpoints ensure safety and code compliance.
8. Cabinet Installation
Cabinet installation typically takes one to two weeks depending on kitchen size and design complexity.
9. Countertops, Flooring, and Finishes
Countertop templating, fabrication, and installation can take two to three weeks. Flooring, backsplash, and trim follow.
10. Final Touches and Completion
Appliance installation, lighting, paint, and final inspections usually take one to two weeks.
Total Kitchen Remodel Timeline in Maryland
Most full kitchen remodels in Maryland take three to five months from design to completion. Larger renovations or custom kitchens may take longer, while minor updates may be completed faster.